High-level cooling and ventilation installed in a UK warehouse by Universal Cooling.

Cooling for warehouses and manufacturing

Installed in Amazon fulfilment centres, BAE manufacturing facilities and food production plants across the UK.

TRUSTED IN THIS SECTORAmazonBAE SystemsMullerDWP

We handle scale

Industrial buildings punish undersized systems. We have installed cooling and ventilation in Amazon fulfilment centres at Minworth, Portsmouth, Huntingdon and Birmingham, in BAE facilities producing parts for the aerospace and submarine industries, and in food manufacturing plants where temperature is part of the process.

Our engineers are vetted for secure sites, and every project is delivered by our own team on agreed deadlines, working around live operations.

Warehouse cooling ductwork installation

More than comfort cooling

Industrial work covers supply and extract ventilation, water chillers, blast chilling for food production, and deep-freeze storage for aerospace applications. Where the process sets the specification, we build to it.

Industrial projects

Amazon Warehouse, Minworth — image 1Amazon Warehouse, Minworth — image 2Amazon Warehouse, Minworth — image 3Amazon Warehouse, Minworth — image 4Amazon Warehouse, Minworth — image 5Amazon Warehouse, Minworth — image 6Amazon Warehouse, Minworth — image 7Amazon Warehouse, Minworth — image 8

Amazon Warehouse, Minworth

A VRF heating and cooling system installed across the site, with air handling equipment and ductwork to meet fresh air requirements throughout. Delivered on time.

Amazon Warehouse, Portsmouth — image 1Amazon Warehouse, Portsmouth — image 2Amazon Warehouse, Portsmouth — image 3Amazon Warehouse, Portsmouth — image 4Amazon Warehouse, Portsmouth — image 5Amazon Warehouse, Portsmouth — image 6Amazon Warehouse, Portsmouth — image 7Amazon Warehouse, Portsmouth — image 8

Amazon Warehouse, Portsmouth

Part of a contract to provide heating, cooling and ventilation to three pop-up Amazon warehouses in Birmingham, Huntingdon and Portsmouth. A prestige project handed over on time under pressure.

Amazon Warehouse, Huntingdon — image 1Amazon Warehouse, Huntingdon — image 2Amazon Warehouse, Huntingdon — image 3Amazon Warehouse, Huntingdon — image 4Amazon Warehouse, Huntingdon — image 5Amazon Warehouse, Huntingdon — image 6Amazon Warehouse, Huntingdon — image 7

Amazon Warehouse, Huntingdon

Part of a contract to provide heating, cooling and ventilation to three pop-up Amazon warehouses in Birmingham, Huntingdon and Portsmouth. A prestige project handed over on time under pressure.

Amazon Warehouse, Birmingham — image 1Amazon Warehouse, Birmingham — image 2Amazon Warehouse, Birmingham — image 3Amazon Warehouse, Birmingham — image 4Amazon Warehouse, Birmingham — image 5

Amazon Warehouse, Birmingham

Part of a contract to provide heating, cooling and ventilation to three pop-up Amazon warehouses in Birmingham, Huntingdon and Portsmouth. A prestige project handed over on time under pressure.

DECA (BAE) — image 1DECA (BAE) — image 2DECA (BAE) — image 3

DECA (BAE)

A fresh air ventilation system with heater battery installed into an existing electrical laboratory with close control cooling. A Mitsubishi Lossnay with around 40 metres of ductwork, commissioned by our engineers.

Muller, Camberley — image 1Muller, Camberley — image 2Muller, Camberley — image 3Muller, Camberley — image 4

Muller, Camberley

Cooling for the new switch room. Two 10kW wall-mounted split systems with drip trays and tank pumps, interfaced to duty rotate and monitored by the building's BMS.

EFW Power Plant, Kemsley — image 1EFW Power Plant, Kemsley — image 2EFW Power Plant, Kemsley — image 3EFW Power Plant, Kemsley — image 4

EFW Power Plant, Kemsley

Downflow cooling units for low voltage switch rooms, VRF air conditioning for the administration building and split systems for general offices. A two year project.

DWP, Banbury — image 1DWP, Banbury — image 2DWP, Banbury — image 3DWP, Banbury — image 4DWP, Banbury — image 5DWP, Banbury — image 6DWP, Banbury — image 7DWP, Banbury — image 8DWP, Banbury — image 9

DWP, Banbury

Heating and cooling supplied and installed to open plan office areas: five twin splits and five single split systems.

Metrolink Hagside Out Station — image 1Metrolink Hagside Out Station — image 2Metrolink Hagside Out Station — image 3Metrolink Hagside Out Station — image 4Metrolink Hagside Out Station — image 5Metrolink Hagside Out Station — image 6

Metrolink Hagside Out Station

Two Daikin wall-mounted split systems operating duty and standby to hold the right temperature for the UPS batteries.

Get a quote for your site

Send us your site details and requirement. We respond the same working day.